Catalogue

Six Supply Divisions.

Filter by division, material, standard and lead time. Every filtered view has its own URL, so you can send this page to a colleague exactly as you left it.

Filter the Catalogue

Material
Standard
Lead time

6 divisions match

Advanced Composite Materials

Carbon fiber, glass reinforcement fabrics, epoxy resin systems, and vacuum consumables.

Grade
3K / 6K / 12K tow
Lead time
7-15 days
MOQ
50 m² (538 ft²)
Precision Machining and Custom Parts

3-axis and 5-axis CNC, turning, sheet metal and rapid prototyping.

Process
3-axis and 5-axis milling, CNC turning, sheet metal
Lead time
10-25 days
MOQ
1 piece prototype
Industrial Hardware and Fasteners

High-tensile bolting, nuts, threaded rod and rivets in corrosion-resistant alloys.

Grade
Class 8.8 / 10.9 / 12.9, A2-70, A4-80
Lead time
3-12 days
MOQ
500 pieces per size
Raw Engineering Metals and Alloys

Stainless, aluminium and specialty grades in plate, bar, pipe and extrusion.

Stainless
304, 316L, 17-4PH — plate, round bar, seamless pipe
Lead time
7-20 days
MOQ
100 kg (220 lb)
Bearings and Motion Components

Ball, roller, ceramic and spherical plain bearings, plus linear guide systems.

Types
Deep groove ball, tapered roller, spherical plain, ceramic hybrid
Lead time
5-18 days
MOQ
50 pieces per part number