Industrial sourcing · China

Precision sourcing and industrial supply from China’s engineering hub.

Certified composite materials, CNC components, fasteners and raw metals for aerospace, automotive and heavy industry. Specification to door in one accountable chain.

Documentation
Material certificates with every shipment
Freight
Door to door on FOB, CIF or DDP terms
Inspection
In-house dimensional inspection before dispatch
Pricing
Direct factory pricing, quoted per RFQ

Supply divisions

Six divisions, one accountable supplier.

Every division quotes against the same terms, ships on the same documentation pack and answers to the same engineer. Filter the full catalogue by grade, standard, size and lead time.

Carbon and glass reinforcement, resin systems and infusion consumables.

Grade
3K / 6K / 12K tow
Lead time
7-15 days
MOQ
50 m² (538 ft²)

3-axis and 5-axis CNC, turning, sheet metal and rapid prototyping.

Process
3-axis and 5-axis milling, CNC turning, sheet metal
Lead time
10-25 days
MOQ
1 piece prototype

High-tensile bolting, nuts, threaded rod and rivets in corrosion-resistant alloys.

Grade
Class 8.8 / 10.9 / 12.9, A2-70, A4-80
Lead time
3-12 days
MOQ
500 pieces per size

Stainless, aluminium and specialty grades in plate, bar, pipe and extrusion.

Stainless
304, 316L, 17-4PH — plate, round bar, seamless pipe
Lead time
7-20 days
MOQ
100 kg (220 lb)

Ball, roller, ceramic and spherical plain bearings, plus linear guide systems.

Types
Deep groove ball, tapered roller, spherical plain, ceramic hybrid
Lead time
5-18 days
MOQ
50 pieces per part number

Torque tools, precision measuring instruments and assembly tooling.

Lead time
5-15 days
MOQ
20 pieces per line item

Filter the full catalogue by material, standard and lead time, or send one RFQ covering several divisions at once.

View all divisions

Sourcing and supply chain

We buy where the part is actually made.

China’s industrial capacity is not in one city. Composite weaving, precision machining, fastener production and bearing manufacture each cluster in different provinces, and the right supplier for your part is rarely the one nearest our door. Fortex qualifies and buys from those clusters directly, without a trading layer in between, so the specification you write is the specification the shop floor reads.

Consolidating at origin means one inspection pass, one shipment and one set of documents, whether the order came from one factory or five. We quote sea, rail or air against your delivery date and price target, and say plainly when air is the only mode that meets it.

How an order runs

Four steps, each with a name against it.

  1. 01

    Specification and CAD review

    An engineer reads your drawing, flags anything unmanufacturable or expensive to hold, and confirms grade, tolerance and finish in writing before anything is priced.

    1–2 business days

  2. 02

    Sample and material testing

    First article or material sample against your specification, with the test data and material certificate that back it. You approve the sample before bulk starts.

    5–15 days

  3. 03

    Bulk production with inspection

    Production under the approved sample, with dimensional inspection and, where the part calls for it, CMM or non-destructive testing during the run rather than after it.

    10–30 days

  4. 04

    Door-to-door freight

    Export packing to sea or air standard, full documentation pack, and freight on FOB, CIF or DDP terms with the tracking reference sent on dispatch.

    7–35 days by mode

Quality and documentation

What arrives in the box, and what arrives in the inbox.

Procurement engineers are not persuaded by badges. They are persuaded by the paperwork matching the parts. Every Fortex shipment carries the documents below, and we will send you a sample pack before you order so you can check the format against your own incoming inspection.

See quality and testing

  • Material test certificate (MTC)

    EN 10204 3.1 for metals and fasteners, carrying the heat or batch number so the material can be traced back from the part in your hand.

  • Certificate of analysis (COA)

    For composite reinforcement and resin systems: areal weight, tow specification, resin batch, and shelf life with the manufacture date.

  • Dimensional inspection report

    Measured values against the drawing, not a pass or fail stamp. Sample size stated. CMM reports where the tolerance or the customer requires them.

  • Packing list and photographs

    Carton-level packing list with weights and dimensions, plus photographs of the goods as packed before the container is sealed.

Send us a drawing and a quantity.

Upload a STEP file or a PDF drawing with your target quantity and Incoterm. We reply to every RFQ within one business day.