PHOTO: composite-materials.jpg
Photography pending
Carbon and glass reinforcement, resin systems and infusion consumables.
- Grade
- 3K / 6K / 12K tow
- Lead time
- 7-15 days
- MOQ
- 50 m² (538 ft²)
Industrial sourcing · China
Certified composite materials, CNC components, fasteners and raw metals for aerospace, automotive and heavy industry. Specification to door in one accountable chain.
Supply divisions
Every division quotes against the same terms, ships on the same documentation pack and answers to the same engineer. Filter the full catalogue by grade, standard, size and lead time.
PHOTO: composite-materials.jpg
Photography pending
Carbon and glass reinforcement, resin systems and infusion consumables.
PHOTO: precision-machining.jpg
Photography pending
3-axis and 5-axis CNC, turning, sheet metal and rapid prototyping.
PHOTO: hardware-fasteners.jpg
Photography pending
High-tensile bolting, nuts, threaded rod and rivets in corrosion-resistant alloys.
PHOTO: metals-alloys.jpg
Photography pending
Stainless, aluminium and specialty grades in plate, bar, pipe and extrusion.
PHOTO: bearings-motion.jpg
Photography pending
Ball, roller, ceramic and spherical plain bearings, plus linear guide systems.
PHOTO: tools-equipment.jpg
Photography pending
Torque tools, precision measuring instruments and assembly tooling.
Filter the full catalogue by material, standard and lead time, or send one RFQ covering several divisions at once.
View all divisionsSourcing and supply chain
China’s industrial capacity is not in one city. Composite weaving, precision machining, fastener production and bearing manufacture each cluster in different provinces, and the right supplier for your part is rarely the one nearest our door. Fortex qualifies and buys from those clusters directly, without a trading layer in between, so the specification you write is the specification the shop floor reads.
Consolidating at origin means one inspection pass, one shipment and one set of documents, whether the order came from one factory or five. We quote sea, rail or air against your delivery date and price target, and say plainly when air is the only mode that meets it.
How an order runs
An engineer reads your drawing, flags anything unmanufacturable or expensive to hold, and confirms grade, tolerance and finish in writing before anything is priced.
1–2 business days
First article or material sample against your specification, with the test data and material certificate that back it. You approve the sample before bulk starts.
5–15 days
Production under the approved sample, with dimensional inspection and, where the part calls for it, CMM or non-destructive testing during the run rather than after it.
10–30 days
Export packing to sea or air standard, full documentation pack, and freight on FOB, CIF or DDP terms with the tracking reference sent on dispatch.
7–35 days by mode
Quality and documentation
Procurement engineers are not persuaded by badges. They are persuaded by the paperwork matching the parts. Every Fortex shipment carries the documents below, and we will send you a sample pack before you order so you can check the format against your own incoming inspection.
EN 10204 3.1 for metals and fasteners, carrying the heat or batch number so the material can be traced back from the part in your hand.
For composite reinforcement and resin systems: areal weight, tow specification, resin batch, and shelf life with the manufacture date.
Measured values against the drawing, not a pass or fail stamp. Sample size stated. CMM reports where the tolerance or the customer requires them.
Carton-level packing list with weights and dimensions, plus photographs of the goods as packed before the container is sealed.
Upload a STEP file or a PDF drawing with your target quantity and Incoterm. We reply to every RFQ within one business day.